IGNOU MMPN-05 ( January 2026 – July 2026) Assignment Questions
Q.1 a) Why is a Construction Supervisor called ‘First-Line Manager’?
b) Describe briefly the methods of execution of a construction project.
Q.2 a) Enumerate the responsibilities of a supervisor appointed by a client.
b) Mention the important documents which a contractor’s supervisor has to maintain on the site.
Q.3 a) Explain the following:
(i) Fabrication Drawing
(ii) Bar Bending Schedule
b) Why Specifications are necessary? What are the requirements of good specifications?
Q.4 a) Explain the importance of Conditions of Contract to a supervisor.
b) Please discuss the various items of variation in a cost estimation of a project.
Q.5 a) Please differentiate the following by taking a suitable example:
(i) Project budget
(ii) Revised project budget
b) Please discuss details of content of a contract for construction management.
Q.6 Write short notes on the following:
a. Drawing register
b. Cement register
c. Steel register
Q.7 Mention the various important control procedures to maintain a quality requirement in a construction management.
Q.8 Explain in detail the different techniques of a consolidation in cohesive and noncohesive soils in a construction sites.
Q.9 List the various points to be checked in execution of a raft foundation for a construction project.
Q.10 Write a list of point to be checked in a painting and glassing work of a large construction office building.